Our Install Process
We endevevor to make the installation of ducted reverse cycle air conditioning as smooth & simple a process as possible for all of our clients.
We know the stress of having retro fit work carried out in your home, so thats why our teams are not only fully qualified and accredited tradesmen but also specialize in domestic installations and are sensitive to our clients needs whilst working in their home.
- The full installation will be completed in one day, with a start time of 7am. Before any work commences our team leader will confirm all outlet and controller locations.
- Your choice of advantage air sunline, streamline, or silhouette ceiling diffusers will be connected to the system by 50mm insulated fire rated flexible duct.
- The outdoor compressor unit will be located on ground level with the final position to be confirmed onsite with the installation manager, the unit will be mounted on rubber feet to reduce vibration.
Please note: the location of the outdoor unit must take into consideration statutory regulations & warranty requirements.
- The indoor fan coil unit will be suspended from the rafters (where possible) within the roof space. Primary and secondary drains shall be provided from the fancoil unit with a gradient fall to a drain point.
- Where possible a choice of classic cream, manor red, or Cottage green Colourbond pipe covers shall be supplied by ACWA free of charge. if notified prior to installation additional colour ranges can be supplied at a charge, galvanised covers are also available on request.
- Once installation is fully completed our team leader will commission your system and go through the operations of the system.
If you have any questions about our installation process or would like a quotation please contact us on 9204 5111 and we will be happy to help.